Paragon Energy Networks was contracted to deliver a low voltage connection for a new social housing development in Perth. The site consisted of 32 new homes requiring individual metered connections with centralised infrastructure planning.
Load assessment and LV connection strategy
Service cable installation and meter cabinet setup
Coordination with SP Energy Networks for approvals
Energisation and final handover
Working alongside other utilities on a constrained timeline
Coordinating multiple energisation requests in a single phase
Ensuring minimal disruption for nearby residents
We aligned energisation timelines with construction handover schedules to avoid rework or delays. Our team also pre-approved all layouts with SP Energy Networks to accelerate the delivery of live supply.
Copyright © 2025 Paragon Energy Networks Ltd. All Rights Reserved. This website, including its design, text, graphics, logos, and other original content, is the exclusive property of Paragon Energy Networks unless otherwise stated. All materials are protected by copyright, trademark, and other intellectual property laws.