The design, installation and post construction commission tests of earth electrodes for a customers & DNO substation sites. These projects included carrying out a soil resistivity survey, develop an earth electrode design to comply with the relevant safety standards both for an electrical fault and lightning protection in the case of wind farms. Installation and post construction earth electrode testing.
Coordination with SP Energy Networks for grid connection
Cable routing and installation
Full commissioning of HV equipment
Tight timeline with only three months for design and installation
Coordination with local DNO (SP Energy Networks) for early approval of designs
Limited access to the site during peak construction season
Safe electrical earthing design.
Copyright © 2025 Paragon Energy Networks Ltd. All Rights Reserved. This website, including its design, text, graphics, logos, and other original content, is the exclusive property of Paragon Energy Networks unless otherwise stated. All materials are protected by copyright, trademark, and other intellectual property laws.